1996
30.07.1996
The casting of the first caissons for the Öresund Bridge´s pylons starts at Kockums Dry Dock in Malmö.
02.12.1996
The casting of tunnel elements for the Öresund Tunnel begins at a purpose-built factory at Copenhagen North Harbour. The tunnel elements are cast in 22 m sections which are joined to form the 176 m long tunnel elements.



